Installation instruction
Matériel et outils nécessaires :
- Aluminum poles of appropriate length
- Jack (lower part with mechanism)
- Bench (Top part which serves to provide a walkway for materials)
- Aluminum connectors to assemble the posts (if necessary)
- Aluminum walkways with non-slip surface
- Anchoring to roof or wall (if applicable)
- Adjustable or socket wrenches
- Spirit level
Installation Steps
1. Preliminary planning
2. Surface preparation
3. Assembling the posts
(if necessary)
If your posts require aluminum connectors to reach the desired height, assemble them according to the manufacturer's instructions. Make sure connections are strong and secure.
4. Setting up the posts
5. Assembly of aluminum walkways
6. Stability check
7. Worker training
8. Use and monitoring
Assembly
& Installation Instructions
Prendre note que ce video ne montre pas nos équipements. L'équipement dans cette vidéo est fabriqués par un autre manufacturier et n'ont pas les nouvelles amélioration que Sky-hi a apporté a ces produits.
Nos systèmes de pump-Jack sont mieux construit, plus ergonomique et plus facile d'assemblage.